# Getting Started with Risk

> Start here: a video tour of the Risk module, what the Lite and Pro tiers each include, and where to go next.

The Risk module tracks project risks against the same WBS, work packages, and activities your cost estimate and schedule already use, then turns them into a contingency figure you can defend.

It comes at two levels, **Risk Lite** and **Risk Pro**. This page covers both, and the video walks the complete Lite workflow end to end before showing what Pro adds.

## Video walkthrough

Writing a risk, planning how you will handle it, checking the data holds up, and running the numbers; then a tour of the Pro features at the end.

<iframe src="https://www.loom.com/embed/980e1e8d91564b08ab3de7366e09dda9" title="Loom video player" frameborder="0" className="w-full aspect-video rounded-xl" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen />

***

## What each tier includes

<Note>
  Which tier your organization has is set per environment by your Dash360 administrator. If you are not sure, look at the Risk Analysis page: if **Cost and Schedule Uncertainty** carries a **PRO** badge, you are on Lite.
</Note>

### Included in both Lite and Pro

| Capability                                                                     | Where                                                                   |
| ------------------------------------------------------------------------------ | ----------------------------------------------------------------------- |
| Risk Register grid, filters, and saved views                                   | [Risk Register](/user-guide/risk/risk-register)                         |
| Add and edit risks; **every field on the form**                                | [Risk Register](/user-guide/risk/risk-register)                         |
| Threats and opportunities, all handling strategies                             | [Risk Register](/user-guide/risk/risk-register)                         |
| Response actions and the Mitigated Risk position                               | [Risk Register](/user-guide/risk/risk-register)                         |
| All three heat maps (Cost, Schedule, Risk Ranking)                             | [Risk Register](/user-guide/risk/risk-register)                         |
| Total Exposure summary across the filtered risks                               | [Risk Register](/user-guide/risk/risk-register)                         |
| Configurable "Risk" and "Mitigated Risk" wording                               | [Registry](/user-guide/admin/registry)                                  |
| Attachments, Risk Review, and custom fields                                    | [Risk Register](/user-guide/risk/risk-register)                         |
| Cost Monte Carlo, risk events only                                             | [Risk Analysis](/user-guide/risk/risk-analysis)                         |
| Both the Risk and Mitigated Risk curves, with **Reduction** and **% Improved** | [Risk Analysis](/user-guide/risk/risk-analysis)                         |
| Percentile summary, custom percentiles, reproducible seeds                     | [Risk Analysis](/user-guide/risk/risk-analysis)                         |
| Saving, reloading, and renaming simulations                                    | [Risk Analysis](/user-guide/risk/risk-analysis)                         |
| Scenario Planner                                                               | [Risk Analysis](/user-guide/risk/risk-analysis)                         |
| Risk Quality Check Report                                                      | [Risk Quality Check Report](/user-guide/risk/risk-quality-check-report) |
| Importing and exporting risks                                                  | [Import and Export](/user-guide/admin/import-export)                    |

Lite is a complete workflow on its own. It produces a real cost distribution from a full simulation, not a colour-coded grid, and it quantifies what your response plan is worth.

### Added by Pro

| Capability                                | What it gives you                                                                    |
| ----------------------------------------- | ------------------------------------------------------------------------------------ |
| **Cost and Schedule Uncertainty cascade** | Model the uncertainty in your estimates and durations, not just discrete risk events |
| **Simulation modes**                      | Run Combined or Uncertainty Only. Lite is locked to Risk Events Only.                |
| **Schedule Monte Carlo**                  | A project finish-date distribution, so the answer is *when* and not only *how much*  |
| **Schedule contingency decomposition**    | Splits contingency between duration uncertainty, risk events, and their interaction  |
| **Monte Carlo by WBS**                    | Allocate a project-level number down the hierarchy                                   |
| **Sensitivity charts**                    | Rank which risks, activities, and cost structures move the answer most               |
| **Per-node reports**                      | Drill into the cost and schedule distribution for any single node of the cascade     |
| **Compare Simulations**                   | Put saved runs side by side instead of eyeballing two charts                         |
| **Delta Analysis**                        | The movement from Risk to Mitigated Risk across the whole register                   |
| **Risk Analytics Burndown**               | Exposure over time, count trends, velocity, drivers, and cash-flow timing            |
| **Correlation**                           | Risk-to-risk and activity-to-activity correlation, so related risks move together    |

### Fields you can fill in on Lite today

Three fields on the risk form carry a **PRO** badge but stay fully editable in Lite: **Start Date**, **Finish Date**, and **Add Activities**. Their only consumers are Pro features, so nothing on a Lite page reads them yet.

Probability and Cost Impact are not badged: they drive the cost Monte Carlo on both tiers.

<Tip>
  Enter these as you go even on Lite. The analytics that read them light up the day you move to Pro, so your history is already there instead of starting from an empty page.
</Tip>

***

## Where to go next

<Steps>
  <Step title="Setting Risk up for the first time">
    An administrator has to configure risk IDs, categories, types, and thresholds before anyone can add a risk. Start at [How to Set Up Risk](/user-guide/risk/how-to/set-up-risk-overview).
  </Step>

  <Step title="Working the register day to day">
    [Risk Register](/user-guide/risk/risk-register) is the full reference for adding, mitigating, classifying, and reporting on risks.
  </Step>

  <Step title="Running the numbers">
    [Risk Analysis](/user-guide/risk/risk-analysis) covers the simulation, reading the results, and saving runs. For the methodology behind it, see [How the Dash360 Monte Carlo Works](/user-guide/concepts/monte-carlo-methodology).
  </Step>
</Steps>

If Pro is something you need, talk to us at [dash360.com](https://www.dash360.com).