- Resource Code The unique code assigned to a resource. Pre-defined and chosen from a dropdown list.
- Basis Code Code that indicates the methodology used to determine the estimate.
- Start Using the calendar, select the desired start date for the resource assignment.
- Finish Using the calendar, select the desired finish date for the resource assignment.
- Resource Assignment Description Short description of resource assignment. *Not required to create Estimate.

When entering a Total, Dash360 can linearly spread that value across the chosen time period. Any changes made to Schedule, Contingency, or Comments and Documents (shown below) require the user to click one of the Save options to track changes in the fields.

Comments / Assumptions Any additional information regarding the estimate not contained in the fields above