- ScheduleAdded Activity ID & Name to the bottom views.
- Fixed the Clear Filters button to clear the Activity IDs and Resources filters
- Schedule Builder: Added the Pencil icon to the edit activities
- Made the Resource Results that show up in the bottom pane a drop down list instead of radio buttons.
- EstimatingCost Estimate Form: Fixed the user views so that all Resource Results are available to every WP regardless of whether that WP has that resource result. This allows you to save a user view that has a Resource Result (Ex: Fringe) and then still view WPs without Fringe. Before your user view would remove Fringe as a selected column anytime you view a WP without it.
- Staffing Plan Report: Fixed the yearly total column so it correctly totals all columns instead of showing an average.
- Cost Summary Report: The Work Package column now has a hyperlink in it. Clicking this hyperlink will take you to that Work Package in the Cost Estimate Form.
- Work Package Report: When choosing the Detailed report type, the Print All functionality would not show the headers for the Labor, Non-Labor and Travel datagrids in the print version. This has been corrected.
- Work Package Report: Added a toggle to the left hand flyout menu to show / hide work packages with no costs.
- ReportingFormat 1030 Report - The timephase report was not showing the correct numbers. It now properly pulls in all of the costs for each 1030 code.
- Cost Estimate Detail Report - Fixed the PDF and Excel Print All to not show the Unit Cost field in the Labor resource assignment grid.
- Cost Estimate Detail Report - Removed the Format 1030 codes from the resource result table column headers.
- AdminImport / Export - Added the Code Result (Format 1030) option to the import and export. This allows you to import and export 1030 code assignments.
- Backup, Restore and Copy Project - Also added the Format 1030 codes to the backup, restore and copy project.
- Dashboard Designer: Fiscal Year Quarter was not properly dividing contingency across the quarters. This has been corrected.
- Dashboard Designer: Added the Format 1030 codes as fields.
- EstimatingCost Estimate Form - Some Work Packages would throw an “Attempted to Divide by 0 error” when loading a work package. This only occurred in rare cases for work packages that had a contingency value but no cost. This has been corrected.
- Cost Estimate Form - If the user uses and is in the middle of the sign off process, then the Details tab should not show the Save button and the Ready for Approval checkbox should be checked and disabled.
- Cost Estimate Form - The Labor, Non-Labor and Travel datagrids have set the default view on a Resource Assignment to not allow the Description or Comments column to be larger than 180 pixels. You can create a custom view to make them larger, but by default, these columns were given a max width value so they would not take over the entire datagrid.
- Cost Estimate Form - The datagrids also had an empty Description field for Resource Assignments even though a value existed. This has been corrected. We also fixed the ID, Resource Code and Resource Assignment Description field to the left pane so you can see those 3 columns as you scroll. You can right click on the columns to Unfix the columns.
- Cost Estimate Form - For customers with a lot of resource assignments in a single work package, we bring you fixed datagrids that won’t scroll past 85% of the total window height. Now, instead, you can scroll inside the datagrid itself vertically. This helps so that you can always see the scrollbars for the datagrid.
- Cost Estimate Form - The datagrids’ process icon would display the Copy & Move Resource Assignment menu to where it was cut off on the last Resource Assignment. This has been corrected so the menu pops up (instead of down) on the last resource assignments.
- ScheduleSchedule Builder - Fixed tracing logic when you click on a predecessor or successor in the bottom pane.
- Schedule Builder - The Constraint Date field caused improper behavior when you changed it. This has been corrected.
- Schedule Builder - Manually entered start and finish dates didn’t always update the activity. This has been corrected.
- Schedule Builder - The CAM selected on a Work Package should be the same CAM that appears for an activity on the Schedule. Now they are the same.
- Schedule Builder - When grouping by WBS and WP, it appears that there are two different WP ids when there is not. Adding a value to the missing Activity Type corrects this behavior. This issue has been corrected.
- Schedule Builder - Add an activity id to the filter options.
- Schedule Builder - The Resource Code filter now filters by resource code instead of resource assignment id.
- ReportingFormat 1030 Report - Added 2 report types to the Format 1030 Report. Fiscal Year report type groups all Format 1030 data by fiscal year so that each row in the output is by fiscal year. The Timephase report type turns each fiscal year into a column and shows data timephased like other reports in Dash360 (ex: Staffing Plan Report).
- AdminRestore Project - This process failed on Cost Estimate Timephase Records because a description column had been added to this spreadsheet in the backup process. The Restore is now fixed so this column does not cause the process to fail.
- Edit Project - If a project did not have a resource file with a rate file attached to it, then the system would throw an error when you went to edit the project. This has been corrected.
- Backup Project - When backing up a project, the Schedule Tasks incorrectly used the Work Package Name instead of the Activity Type. This has been corrected.
- Import Risks - When importing risks, the system would error when supplying a risk type. The system has now been updated to take Risk Type into account for import, backup, restore and copy project.