- Cost Estimating Reports → Format 1030 Quality Check Report: This new report allows you to see all of the resource codes for a project. Then, it shows all of the resource results as columns and tells you whether a Format 1030 code is assigned for that resource result or not. A value of “Yes” means the result does have a Format 1030 code. A value of “No” means it does not. An empty value means that resource code does not have that resource result as part of it’s calculation.
- Cost Estimating Reports → Basis Code Quality Check Report: This new report allows you to see all of the resource assignments and whether or not a basis code is filled in for that assignment. A value of “Yes” means a basis code has been filled in. A value of “No” means a basis code is missing.
- Cost Estimate Form / WP Report: You can now search within a WP from the filter drop down.
- Cost Estimate Form: The form now remembers what panels you have open / closed and will remember them if you refresh the page, leave and come back to the page or page through results.
- Cost Estimate Detail Report now includes the popup sticky note that is available on the Cost Estimate Form. This allows you to see the Labor, NonLabor, Travel and Contingency costs in a nice popup panel.
- Compare Projects: A new report has been built that allows you to compare 2 project’s costs to each other so you can see any differences.
- When Backing up a project, the system now backs up all linked code files for a project.
- A bug was fixed where a CAM assigned to a specific work package would cause an error to appear in the Cost Estimate Form. This has been corrected.
- Importing Cost Estimates: Changing a WP Number would not change that number in all necessary tables. This has been corrected.
- The Admin → Export dropdown has been sorted so all options in the dropdown are in alphabetical order.
- The Admin → Export → Resource Assignment Notebook Entries would not show the correct notebook fields in the Notebook Category filter. Instead of showing RA notebook categories, it was showing work package notebook categories. This has been corrected.
- Recalculate Project now fills in any missing months between a resource assignments start and end date with 0 records. Not having these 0 records would cause issues with backwards calculating resource assignment units. This has been corrected. Also fixed a bug where contingency data was not properly getting recreated when recalculating a project.
- Admin → Import → Contingency Assignments: Deleting contingency assignments sometimes failed with an error. This has been corrected.
- Admin → Resource Code: When bulk editing resource codes, if you copied a resource calculation from another resource code, you could not apply the Format 1030 codes. This has been corrected so you can now perform this feature.
- Estimating → Cost Estimating Reports → Cost Summary Report: If the quantity field registry setting is turned off, then the quantity field should not be used to calculate totals. This has been corrected.
- Estimating → Cost Estimate Form → Import Timephase Data: When importing timephase data, the system would not allow you to change the resource code for an existing resource assignment. This has now been corrected.
- Estimating → WBS Dictionary: When looking at the WBS Dictionary, sometimes the WBS codes were not in order. This has been corrected.
- Admin → Codes → Tree: Sometimes when viewing a hierarchal code file, you could not scroll the tree. This has been corrected.