Sunday, June 18th, 2023 New Features
  • Estimating → Cost Estimate Reports → WBS Summary Report: Enhanced this report to show a stacked bar chart of FTE and Subtotals by a Resource Code → Code File of your choice. Set the Resource Code → Code File from the Admin → Edit Project → Reports tab. You can also customize the colors of each code. If you do not select a Resource Code → Code File, then these 2 new stacked bar charts do not appear on the report.
  • Admin → Projects → Cost Class: Added the ability to assign a unique rate file to a cost class. If you assign a different rate file to a cost class, then Dash360 uses that rate file instead of the default one attached to your project.
  • Estimating → Staffing Plan Report: Added a Units filter at the top of the page that allows you to show FTE, Hours or Subtotal on this report.
  • Tableau: Added Resource Code → Code Files / Codes to Tableau. We also added Signature Signoffs and a separate columns for every Resource Type (Labor, Non-Labor and Travel), Resource Result (Direct, FTE, Hours) and Fiscal Year. These new columns pivot the data and make it easier for our Dashboards and our normal reports to also eventually pull from this table.
Bug Fixes & Small Enhancements
  • Earned Value → Calculate EV: The Calculate EV process was failing in some edge case scenarios. Fixed some calculation issues where we recalculate the CTD CV field for the current period if the EAS work package is not returning 0 for this field. Found a couple of scenarios where a CTD CV could be <> 0 in some edge cases. Fixed those so they should not occur in the future.
  • Admin → Projects → Copy Cost Class: When copying a Cost Class, the system would not copy longevity pay or MTDCs to the new Cost Class. This would cause issues where the target cost class would not equal the source cost class. This has been corrected. We also made “Replace” the default option.
  • Estimating → Cost Estimate Reports → Cost Summary Report: Worked on speeding up this report. For some of our clients with large datasets, this report was taking 5+ minutes to load. We believe this time will be improved with this release. More speed enhancements will be coming soon.
  • Risk Register: If you edited a risk that did not have a Trigger Date already set, Dash360 was accidentally setting the Trigger Date to 12/31/1969. This has been corrected so the field will remain blank until you fill it in.
  • Estimating → Cost Estimate Form: If you were viewing the form using a User View and you made changes to the Schedule or CPR data grids, the system would not save any grid layout changes you made. Now, the system does record those layout changes.